Step 5: Check Results (3)
Placement and Routing Report includes resource summary
- Indicates the percentage of utilization
- The number of I/O and flip-flops is specified
- Reports if the design routed
- Gives an overall timing score
- Score of zero indicates all timing specifications were met
Post Layout Timing Report
- Based on block delays and net delays after routing
- Used for detailed delay analysis after implementation
Pad Report
- Cross reference of Input/Output components and package pins